Home >

Practical Model Of Contract For Outward Processing Of Garments

2011/5/5 10:52:00 17

Clothing Contract Template

 

clothing

Contract for outward processing


Party A (Supplier): contract, contract, and contract No.


Party B (processing party): the location of the contract is: the "location": "the" "


Through friendly consultations, the following agreements have been drawn up:


First, sign the time: the date of delivery.


Order No., name of commodity, quantity, unit price, and cost per item.


This is the first time.


Two. Party A has commissioned processing according to the "production processing and making orders".

style

The quantity, the time of delivery, and the provision of OK templates, process manufacturing requirements and quality standards are recognized by both parties. They are part of the contract and have the same legal effect as the contract.

If there is a need to change the board or other special needs in the middle of production, there must be written notice.


Three, Party B is responsible for the two-way pportation cost of each production and processing sheet.

The sewing thread is provided by the company, and the cost is borne by the company.

The supplier of the line is: the price of the cable, the price of the line is:


Four, Party B shall have all the technical and technical data, samples, marks and models checked by Party A to confirm that there is nothing wrong with it, so that it can be put into production.

If there are any problems, inform Party A in time.

Otherwise, the quality problem and the economic loss will be borne by the processing party.


Five, Party B should produce quality and quantity according to the contract and deliver the goods on time.

As Party B's liability is not responsible for shipment, it will be compensated according to the retail price of this quantity and the penalty for the delay of the contract period.

If it is overdue one day, it will be charged 1% of the total price of the goods. If it is two days overdue, 2% of the total price of the goods is deducted, and so on, if the party fails to deliver the goods on time due to the reasons of Party A (materials or other materials), the two parties will issue a separate order and sign the contract.


Six, the number of finished products delivered by Party B is missing, which is to be repaid by two times the cost of goods per thousand units and three pieces below.

More than three items shall be compensated according to the cost of the goods plus two times the retail price of the market (deducted from the processing fee).


Seven, large delivery Party A to do the tail part of the process, found product oil pollution, jumper, rotten hole, drawnwork, chromatic aberration and other conditions, notify Party B to solve.

If Party B fails to return to the company in time, or the delivery period is urgent, Party A's helper will distribute the film and return the execution. Party A deducts the work time of Party B's rework, which is deducted from the processing fee at the rate of 3 yuan per hour.


Eight, Party A provides each paragraph.

cloth

The material loss is calculated according to the number of orders, and the cost of the excess part shall be borne by Party B.

Party a must check the incoming materials, check all incoming materials and sign in a certain time.

If the cloth and material can not be produced if there is any quality problem, they should be handed over to Party A in time.

Otherwise, the loss will be borne by Party B.


Nine. Check the cloth before cutting the bed.

If it is found that there are quality problems (including short yards of cloth) and the actual dosage exceeds the amount of the production, the Party A shall immediately notify Party A to discuss the solution.


Ten, Party A should do the following procedure for Party B to calculate the cost: phoenix eye 0.1 yuan / grain, button door 0.025 yuan / grain, Zao Zao 0.018 yuan / grain, cut the line 0.2 yuan / piece.


Eleven, the way of settlement: according to the actual shipment quantity of Party A, 5 per thousand can accept the inferior products according to the situation (up to half price per unit price), and the super defective products are deducted at cost price.

The monthly shipment will be settled from 25 to 30 next month, and will be notified if there are any special circumstances.


Twelve, Party A and B should act in a sincere and cooperative manner.

contract

If there is any dispute or negotiation, the two sides can solve it through legal channels.


Thirteen. The contract is in two copies. Each Party A and B shall hold one copy and have the same legal effect. This contract shall come into force on the date of signing by the representatives of both parties.


Party A (Supplier): Party committee, Party committee, processing company.


Address: the address is: the address of the two sides of the earth.


Authorized representative: the company is stamped with the seal of the company.


Authorized representative: the company is stamped with the seal of the company.


Date: the date of the first, the first and the last.

  • Related reading

Kooba

Learning Area
|
2011/5/5 10:49:00
95

Relationship Between Shrinkage And Sample Size Of Knitted Garments

Learning Area
|
2011/5/5 10:47:00
50

Kesalan Patharan

Learning Area
|
2011/5/5 10:44:00
96

Krug Cook

Learning Area
|
2011/5/5 10:38:00
72

An International Multi Skilled Chinese Fashion Designer -- Yang Ziming (Cabbeen) Sixteen

Learning Area
|
2011/5/5 10:32:00
106
Read the next article

Spring And Summer Perspective Is Popular; &Nbsp; Lin Chiling.

The clairvoyant never seems to quit the gorgeous stage. It seems as if you are deliberately trying to tease your visual nerve.